Dhanush Mepcentre

Project manager MEP

Dhanush Mepcentre Kolkata, West Bengal, India · ₹780K–₹840K/yr

Education Administration Programs · 11-50 employees

Oct 17
project-manager Senior (5-10 yrs) Full-time India
Create a free account to apply — email only, no card. You can also save this posting or score it against your profile with AI.

About the role

The Project Manager will oversee MEP design coordination, procurement, and site execution to ensure projects are completed on schedule and within specifications. They are responsible for managing inter-disciplinary alignment, enforcing quality and safety standards, and conducting final system testing and handover.

What they look for

MEP Project Management BIM Revit Autocad HVAC Electrical Systems Plumbing Procurement Contract Management Site Execution QA/QC HSE Compliance Microsoft Project Primavera Commissioning Statutory Compliance

Requirements

Candidates must have 7 to 8 years of experience in MEP project management with strong technical knowledge of HVAC, electrical, and plumbing systems. Proficiency in Microsoft Project and BIM/Revit coordination is essential for managing project schedules and spatial design clashes.

Full description

Project Manager MEP Work location Bangalore Airport

Experience 7 to 8 years

Scope Of Work

1. Pre-Construction & Design Coordination

  • Clash Detection & BIM/Autocad Review: Lead BIM/Revit coordination

meetings to resolve spatial clashes between HVAC ducts, cable trays, fire

lines, plumbing pipes, and structural elements (beams, slabs, shafts).

  • Drawing Validation: Review and approve Good for Construction (GFC)

drawings, shop drawings, schematics, and builder's work drawings (core-cut

and sleeve locations) before work starts.

2. Procurement, Contracts & Commercial Management

  • Technical Bid Evaluation (TBE): Evaluate subcontractor quotes and

equipment proposals against project design criteria and approved vendor lists.

  • Material Submittals & Approvals: Scrutinize Material Inspection Requests

(MIRs) and technical data sheets for major plant equipment (chillers,

transformers, DG sets, pumps, panels, AHUs, fire alarm systems).

  • Billing & Variations: Verify contractor measurement sheets, certify running

account (RA) bills, and assess subcontractor variation claims against the

original Bill of Quantities (BOQ).

3. Site Execution & Interface Management

  • Civil-Structure Alignment: Ensure wall openings, slab sleeves, cast-in

conduits, and foundation plinths for heavy machinery (e.g., chillers, cooling

towers, transformers) are executed on schedule before structural concrete

pours.

  • Daily Progress Monitoring: Track execution milestones using Gantt

charts/Primavera/MS Project against the master project schedule.

  • Inter-Disciplinary Alignment: Resolve boundary issues between specialized

trades (e.g., BMS controls vs. HVAC dampers; fire pump room piping vs.

electrical starter panels).

  • Weekly/Daily Meeting: Need to attend site co-ordination meeting with client

and other vendors.

4. Quality Control, Safety & Statutory Compliance

  • QA/QC Enforcement: Implement the MEP Quality Inspection Plan (ITP),

verify pressure testing (hydro-testing of chilled water, firefighting, and

domestic lines), insulation integrity, and cable megger testing.

  • HSE Compliance: Enforce site safety standards for hot works

(welding/brazing), working at heights, confined space entries (shafts, tanks),

and lock-out/tag-out (LOTO) procedures.

  • Liaison & Authority Clearances: Secure statutory approvals and

inspections, including:

o Electrical Inspectorate (CEIG / State Electrical Board) for

substations, HT panels, and DG sets.

o Fire & Emergency Services for fire pump operations, hydrants,

sprinklers, and life safety NOCs.

.

5. Testing, Adjusting, Balancing & Handover (TAB & T&C)

  • Pre-Commissioning Checks: Verify dry-run procedures, electrical phasing,

rotational checks on motors/pumps, and duct air-leakage tests.

  • Integrated Testing: Conduct integrated building system tests (e.g., initiating

a fire alarm trip to confirm that AHUs trip, stairwell pressurization fans

activate, access control doors unlock, and elevators recall to ground level).

  • Handover Documentation: Compile As-Built drawings, Operation &

Maintenance (O&M) manuals, warranty/guarantee certificates, spare parts

lists, and train the client's facility management (FM) team.

Essential Technical Knowledge Matrix

Service

Domain Key Systems Managed

Mechanical

(HVAC)

Chillers, VRF/VRV units, AHUs, FCUs, ventilation fans, duct

networks, chilled water piping, balancing valves.

Electrical (HT

/ LT)

Transformers, HT/LT panels, busducts, DG sets, UPS, cable

trays, earthing grids, lightning protection, internal/external

lighting.

Plumbing &

PHE

Water supply networks, hydro-pneumatic pumping systems,

drainage, rainwater harvesting, Water Treatment Plants

(WTP), and STPs.

6. Must be knowing MSP – Microsoft Project for preparation of Schedule.

Similar roles